WICO partner, Diputacion de Huelva, has been successful in modifying future regional legislation so that small scale wind installations will be considered separately from large scale wind parks for the process of grid-connection.
This is a very important step which was approved in late July 2011 and is an excellent result for the WICO project.
The revised legislation enables small wind installation (under 30MW) to be excluded from the normal general assessment procedures for wind installations which will be of great benefit.
The 5th and final WICO newsletter was sent out in August 2011 and is available to download from the following link:
http://www.marinesoutheast.co.uk/wico/news/
The WICO guidelines are now available to download please follow the link to download your copy:
http://www.marinesoutheast.co.uk/wico/downloads/
WICO partner, Diputación de Huelva has produced a video clip that can be seen at the following link
http://www.youtube.com/watch?v=7TbxJorz_xg
WICO has produced an e-brochure detailing the project background as well as listing the project aims and giving information on the project partners.
The brochure is available to download from
http://www.marinesoutheast.co.uk/wico/downloads